成人aV无码网址|玖玖视屏在线播放|69久草按摩视频|丝袜射精在线观看|男女久久精品视频|99香蕉热精品|欧美色图播放器|岛国无码专区白丝|91精品安全网站|日韩AP在线观看

#

CASE

Section II of Zhengzhou Fourth Ring trunked steel concrete composite beam bridge

16565825081046181E30.jpg


The project is located at the intersection of Zhengwei road and South Fourth Ring Road in Zhengzhou city. The undertaking part is the steel-concrete composite beam part of the 12th and 13th links of the main line of Zhengwei road in the second working area of South Fourth Ring Road. The total length of 12 links is 183 meters, the total length of 13 links is 185 meters, and the width is 16.5 meters.

Recommendation of relevant cases

Contact us

Stock code
600477

Home

Close